I know I promised a real post on the construction I talked about. But here is a temp one.

I wanted to update everyone on the small bathroom construction and the under the both bathrooms kitchen sink broken pipe.   Here is the original pipe break.  Please remember Ron is 70 years old.   Hugs

So that was just past the wall inside out master bedroom bathroom.  But to reach it Ron had to take up the floor in the small bathroom off the hallway and climb / twist his way in around the pipes and then crawl on his belly to the break.  He had to work laying on his belly.

 This was the hole he had to crawl / twist down. 

Here is where the project stands now.  Our bedroom bathroom has a thick rubber tarp over the plywood floor, the small bathroom entire flooring has been removed.  This morning we talked about what should be placed where in the new lay out.  Hugs.

 This picture shows him standing where he had to crawl down, notice the layout of the pipes.     The entire floor and insulation has been removed in the small bathroom.  He is right now cleaning up all the cat litter he put down, 60 pounds to dry up the leak, along with any wood pieces or stuff that fell into the hole while he worked.  Hugs